KVAD Charts (17) Available Charts (17)
Airport Diagrams (1)
|
APD
AIRPORT DIAGRAM
|
|
Instrument Approaches (16)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
IAP
TACAN Y RWY 01L
|
|
|
IAP
TACAN Y RWY 01R
|
|
|
IAP
TACAN Y RWY 19L
|
|
|
IAP
TACAN Y RWY 19R
|
|
Minimums (1)
|
|
Airport Diagrams (1)
Instrument Approaches (16)
Minimums (1)
Building a trip? Bundle KVAD with your departure, destination, and alternates — one PDF, ready to print.
You have KVAD charts in your binder.
Search for your other airports above, or generate your PDF.
Your binder has from airports.
Search for your other airports above, or generate your PDF.
hdg as assigned by ATC; requires min climb of 254’/NM to 700.
300-1½ or std w/min climb of 254’/NM to 700.
hdg as assigned by ATC; requires min climb of 223’/NM to 700.
300-1¼ or std w/min climb of 223’/NM to 700 or with std mins and a std 200’/NM climb gradient, takeoff must occur NLT 1700’ prior to DER.
| CD | 120.625 | |
| APP | 125.475 | Valdosta |
| DEP | 126.6 | Valdosta |
| CTAF | 128.45 | |
| TWR | 128.45 | |
| APP | 132.375 | Valdosta |
| GND | 138.95 | |
| ATIS | 142.6 |
How to Read an Approach Chart
Section-by-section walkthrough with interactive diagrams and a quiz.